These projects consisted of renovating and re-adapting existing classrooms in four high schools to serve as Career Technology Education (CTE) laboratories/ classrooms for Health & Science, Early Childhood Education and Apparel per Aldine ISD/ CTE’s program requirements.

The scope of these renovations included:

  • Architectural (All Schools) – All of the renovated classrooms required new finishes and casework, data and power connections if not existing, and new lighting.
  • The Health Science Labs required the addition of 2-3 sinks per classroom, a hospital bed set-up, and space for incubators and autoclaves. This included the addition/relocation of plumbing lines and drainage for water/wastewater.
  • The Early Child Development Lab (ECD) required the addition/relocation of one sink, water fountain and one child restroom with one toilet fixture. This included the addition/relocation of new plumbing lines and drainage for water/wastewater. All of these classrooms were previously Home Economics classrooms and already had several sinks & kitchen equipment that were removed, and plumbing lines not used were capped.
  • The Apparel classroom required the addition/relocation of one sink and new display cases in the corridor to showcase student work.
  • The MEP scope included the addition of toilets, plumbing fixtures, and drinking fountains.

Join Our Newsletter

Name
Office
Please direct this inquiry to:

Renovations of Aldine ISD High Schools